Tel: +86-769-88996313

E-mail: sf@camda.cc

100 KW Biogas Generator

100 KW Biogas Generator

Ratings *Ratings at 0.8 power factor Performance Data * The above fuel consumption is calculate with the natural gas whose heat value is 35.8MJ/Nm 3 Dimensions and Weights Engine Brand & Model: HGN14 Engine Data How to clean the cooling system: ◇Use eau douce to clean the cooling system; ◇If...

Send Inquiry
Product Details

KDGH120-BG   50HZ 1(001).jpg


Ratings

Rated  Power

kVA

150

kW

120

Voltage type

50Hz, 380/220V, 3 phases and 4 wires

*Ratings at 0.8 power factor


Performance Data

Engine Brand & Model

HGN14

Alternator Brand & Model

LSA44.3L10/120KW

Control System

Deepsea DSE6120

Standard Noise Level@7m (Soundproof Sets)

75 dBA

Circuit Breaker Type

3 Poles MCCB

Frequency & Phase

50hz 3Phases + 4Wires

Engine Speed (RPM)

1500

Fuel Consumption (Nm3/hr) 100% Load

37.71

* The above fuel consumption is calculate with the natural gas whose heat value is 35.8MJ/Nm3


Dimensions and Weights

Content

Open type

Soundproof Sets

Dimensions: (mm)

L

2800

3500

W

850

1300

H

1480

1900

Weights (kg)

1850

2850


Engine Brand & Model: HGN14

Engine Data

No. of Cylinders

6

Engine power(KW)

145

Cycle

4 Stroke

Cylinder Type

Wet

Bore * Stroke (mm)

140 * 152

Compression Ratio

11:1

Induction

Aftercooled

Displacement (L)

14

Cooling Method

Water cooled

Governing Type

Electronic

Starting method

24V DC motor

Coolant capacity, including radiator (L)

66.8

Lubricant Oil

15W40-CF4 or above grade

Oil pan capacity (L)

36


How to clean the cooling system: 

◇Use eau douce to clean the cooling system;

◇If there is a drainage valve, close it or connect the coolant pipe;

Note: In order to avoid producing air pocket, and the speed of intake coolant could not be over 19 L/min.

◇Inject the mixture of water and cleaner into cooling system. Consult the manufacture 's direct, close the cover; 

◇Start the engine, running the genset without any load for 30 minites, and wait the coolant temperature reach to 82 ℃(180℉). 

◇Stop the engine, after it has been cold, loosen the cover of cooling system and depress its pressure. Take off the cover, open the drainage valve (if there is), or take off the coolant pipe at the bottom, so that the coolant can leak out from cooling system, and use eau douce to clean the cooling system, then close the valve or connect the coolant pipe.


How to add coolant: 

◇Inject the right coolant to the cooling system via the injector, but don't cover the injector.

◇Start the engine, and keep idle running for1 minute so as to discharge all the air among the gaps, and then stop it.

◇Check the coolant level and keep it equal the bottom of the injector.

◇Clean the cover of the injector, and check its gasket. If the gasket gets out of work, the cover needs to be replaced. If the gasket can work, please use right PRESSURE INSPETING TOOL to inspect the injector cover and check if it meets the required pressure marked on the cover. If it can't meet, please replace to new injector cover.

◇Start the engine, check the cooling system whether any leak occurred, and whether the runing and temperature on good condition.


Protective equipment: 

The safe and protective equipment must be installed when install gas generator set, to protect the personal and matterssafety. The protective panel should be installed for revolving parts or moving parts. The heat insulating equipment should be installed for high temperature parts to ensure the safety of operator.


Crankcase breather:

All engines are designed with crankcase breather and exhaust pipe to discharge the gas of crankcase, lower the pressure of crankcase. Please check if the installing position of crankcase breather and exhaust pipe are right or faulse before genset operation.


Cooling system clutch and connection:

When the engine is still operating or water temperature is still very high, please don't loosen the clutch. Because the pressure of cooling system is very high, if the clutch is loosen, high temperature water will be sprayed out and cause seriously scald. After the engine and water cool, heat exchanger, thermometer box and radiator clutch can be open. In order to ensure the person and genset safety, please change the problematic and aged pipes timely.


2.jpg


Hot Tags: 100 KW biogas Generator, China, suppliers, manufacturers, factory
Related Products
Inquiry